Friday 7 October 2011

How to make a yurt platform - Alex's fairly definitive guide (including pictures)

Now that I've made a raised wooden platform for the play yurt,


a beaten earth platform with dry-stone retaining wall for our 18-foot yurt,


an 18-foot beaten earth platform with woven chestnut retaining fence for our first guest yurt,


a wooden platform for our second 18-foot yurt,


and a second 18-foot earth platform on a slope for our second guest yurt,


I feel qualified to write a fairly definitive guide to how to build a yurt platform. I'll be happy to answer questions if anything needs clarification, time permitting.

Before I started my latest platform, I bought:
o Thirty 2.5-metre lengths of rough 7.5 cm by 4 cm douglas fir from a nearby woodyard
o A six-litre tin of treatment against wood-boring insects
o 27 square metres of pine flooring, 23 mm thick, 10 cm wide and 2 m long
o A five-litre tin of protective treatment for the finished floor - oil with a white pigment
o A box of 200 screws 70 mm long, 5 mm wide
o A box of nails 40 mm long, 2 mm wide

On day one, I laid down and levelled the floor joists 61 cm apart, and screwed noggings between them to strengthen the frame.


I was lucky enough to have almost level ground to work on, and some old tiles and bits of wood lying around. Levelling an area like this takes a huge amount of work and is covered in other posts.


On day two, I joined the ends of the joists, trying to get these outside noggings as close to the finished edge as possible.


The weight of the yurt will be resting on this edge, which is why I put supports at the top, bottom and sides.


An important point here, in capital letters: THE FINISHED FLOOR FOR AN 18-FOOT COPPICED YURT IS 18 FEET 4 INCHES - the 18 feet is in the internal measurement. If you are using sawn timber, just add the wall width on both sides to your internal finished size.


On day three, I started laying the floor, aiming for as little wastage as possible, pre-drilling holes diagonally through the tongues wherever the boards crossed a joist.


This is what I can do in about 10 hours working alone.


On day four, I finished laying the floor while Her Outdoors applied the first layer of oil. Unfortunately, the oil had an eight to 12-hour drying time between coats, so this day ended up being quite long too. Rain had appeared on the forecast I use and we were now chasing the weather as so often happens.


On day five, I screwed 10 cm strips of 5 mm ply to the outside edge of the platform.


For some reason this doesn't come up much in yurt books, or sites talking about yurt platforms, but we find it essential. The edge makes putting the frame up a breeze, doesn't cost much, cuts down on draughts, holds in the insulation and even stops slugs coming in to eat the cat food.

If you have large items of furniture and small doors like us, you'll want to move these onto the platform before putting your retaining edges on.

UPDATE

I've since discovered you don't need to pre-drill those holes. Just make sure they are angled nicely into the wood. Saves a bit of time.

8 comments:

dND said...

Wow, a labour of love and a thing of beauty too.

the devolutionary said...

Thanks. It always feels very Andy Goldsworthy.

Ben said...

You are a bit of a pro nowadays. Good information that I will no doubt be referring to in the near future. Nice pictures too.
Thanks mate!

the devolutionary said...

If this is THE Ben of flirtingwithyurting, welcome to the comments section. And yes, I wrote this for you guys.

andrew said...

good timing. my yurt is up but no floor. thanks.

the devolutionary said...

No problem, Andrew. Glad to be of service...

Unus_Mundus said...

hi

I'm really interested tonlearn about your earth base.

im conceptualising a sandbag /stone holding wall. a tarp lining laid inside then filled with soil/sand and beaten flat

planning wise it can't be permanent. and am hoping something like this (or yours?) could offer a suitable base for our yurt in Devon

thanks

the devolutionary said...

Hi Unus - and thanks for the comment.

I've moved the blog over to https://thedevolutionary.wordpress.com/ where you'll find the latest on my ongoing yurt platform research.

These days I'm using acacia uprights, which are not permanent (but good for 100 years), with shop-bought joists and joist hangars. Still having issues with the pine T&G, which is moving around quite a lot. I'm going to dispense with the hidden nails and go straight through the boards on my next platform, which will be in the next few weeks...